
REQUEST FOR EXPRESSIONS OF INTEREST
(CONSULTING SERVICES - FIRMS SELECTION)
Republic of Moldova
Strengthening Moldova’s Disaster Risk Management and Resilience Project
Loan No.: 9720-MD
Assignment Title: Consulting services for the preparation of a Feasibility Study for new and re-developed meteorological infrastructure, new hydrological observing infrastructure, and associated engineering works
Reference No. (as per Procurement Plan): MD-OEAPM-552717-CS-CQS
The Government of the Republic of Moldova has received financing from the World Bank toward the cost of the Strengthening Moldova’s Disaster Risk Management and Resilience Project, and intends to apply part of the proceeds for consulting services.
The consulting services (“the Services”) include the preparation of a Feasibility Study for new and re-developed meteorological infrastructure, new hydrological observing infrastructure, and associated engineering works for Public Institution – Meteorology and Environmental Monitoring Authority (IP AMM).
The Terms of Reference (TOR) for the assignment are attached to this request for expressions of interest.
The P.I. “Office for External Assistance Programs Management” (OEAPM) Project Implementation Unit (PIU) now invites eligible consulting firms (“Consultants”) to indicate their interest in providing the Services. Interested Consultants should provide information demonstrating that they have the required qualifications and relevant experience to perform the Services. Shortlisting criteria are as follows:
Key Experts will be evaluated at the shortlisting stage.
The attention of interested Consultants is drawn to Section III, paragraphs, 3.14, 3.16, and 3.17 of the World Bank’s “Procurement Regulations for IPF Borrowers” September 2023 (“Procurement Regulations”), setting forth the World Bank’s policy on conflict of interest.
Consultants may associate with other firms to enhance their qualifications, but should indicate clearly whether the association is in the form of a joint venture and/or a sub-consultancy. In the case of a joint venture, all the partners in the joint venture shall be jointly and severally liable for the entire contract, if selected.
A Consultant will be selected in accordance with the „Consultant’s Qualification-based Selection” described in the Procurement Regulations and to be specifically set out in the Request for Proposals.
The Expression of Interest shall clearly state the name of the Consultant (individual Firm, Joint Venture or sub-consultancy). The Consultant shall provide relevant references (assignment name, Client, time frame, the role of the firm (main Consultant/Partner in JV/sub-consultant, contract amount, tasks performed etc.) to confirm its experience and qualifications.
Further information can be obtained at the address below during office hours 08:30 to 17:30 hours.
Expressions of interest must be delivered in a written form to the address below (in person, or by mail, or by e-mail) by 17:30 local time, June 15, 2026.
Attn: Ms. Raisa CANTEMIR
Director, Office for External Assistance Programs Management / PIU
57/1 Mitropolitul Banulescu Bodoni str., office 306, MD-2005, Chisinau, Republic of Moldova
Tel: 373 22 23 29 63, 373 23 82 48
E-mail: achizitii.proiecte@ogpae.gov.md
LOAN AGREEMENT NO. 9720-MD/2025
“Disaster Risk Management and Climate Resilience Strengthening Project
in the Republic of Moldova” (SMORE, P504278).
Component 2 Improvement of Hydrometeorological Services
TERMS OF REFERENCE
Consulting services for the preparation of a Feasibility Study for new and re-developed meteorological infrastructure, new hydrological observing infrastructure, and associated engineering works
SUMMARY
Terms of Reference (TOR): Consulting Services for the preparation of a feasibility study for new and re-developed meteorological and hydrotechnical infrastructure of the Public Institution - Meteorology and Environmental Monitoring Authority (IP AMM), including:
CONTEXT AND OBJECTIVES OF THE PROJECT
Background
Objectives
Scope
Note: If any discrepancies arise regarding the locations proposed in the existing study, alternative locations compliant with the established requirements shall be identified and proposed (within a radius of 5km, at similar altitudes, landforms and conditions, Guide to Meteorological Instruments and Methods of Observation, WMO No. 8)
EXPECTED RESULTS AND CALENDAR
(working man- days)
|
Deliverable |
Team leader |
expert hydro/ meteorology |
technical expert 1 |
technical expert 2 |
total man-days and percentage of payment |
Presentation /validation of deliverable |
|
|
1 |
2 |
3 |
4 |
5 |
6 |
7 |
|
|
1. Initial report, methodology and work plan for |
5 |
- |
- |
- |
5 (2,5%) |
5 day |
|
|
2. Feasibility Study, in accordance with Annex 5 which shall include the following sub-deliverables: a) an assessment report of the existing hydrological observation network, indicating its density, territorial coverage, and gaps in relation to local needs and the recommendations of the World Meteorological Organization (WMO) [1]. b) Conclusions and recommendations regarding the placement of new meteorological infrastructure at existing sites, including 2 meteorological stations, 3 hydrological stations, 14 new hydrometric posts, and 11 existing posts, with modular buildings and associated meteorological and hydrotechnical infrastructure. c) a filled out Public Capital Investment Project Identification and Evaluation Form, which shall include the project summary, technical analysis, economic and financial analysis, legal and institutional assessment, impact assessment. d) A section on social and environment assessment for each location, elaborated in accordance with Annex 4. |
20 |
30 |
5 |
5 |
60 (25%) |
30 day |
|
|
3. TOR for the procurement of design works for newly installed stations, including associated hydrotechnical infrastructure, as follows: a) TOR for the design and operationalization of premises and related infrastructure for 2 meteorological stations (Comrat and Bravicea)[2]; b) TOR for the design and operationalization of premises and related infrastructure for 3 hydrological stations (Ungheni, Costești, and Criuleni)[3]; c) TOR for the design of hydrotechnical infrastructure for 14 new hydrometric posts, in accordance with the identified locations; d) TOR for the design of hydrotechnical infrastructure for the reconstruction and rehabilitation of infrastructure at 11 existing hydrometric posts. |
5 |
20 |
5 |
30 (12,5%) |
45 day |
||
|
4. Technical specifications for equipment and related systems to be installed at observation stations, Including: § observation components and parameters; § hardware/software solutions for data collection, storage, and transmission; § equipment integration and protection; § installation and connection requirements; § warranty period, maintenance, and sustainability; § staff training for operation and maintenance; § data management mechanisms, quality control, and reporting; § compatibility and integration with the existing network. |
5 |
5 |
30 |
40 (15%) |
60 day |
||
|
5. Introductory field visits regarding the advantages and benefits of the project for local authorities and landowners. Approvals and authorizations required for site validation and for initiating procedures to confirm preliminary requirements, in accordance with Annex 3 [4]. |
30 |
30 |
30 |
90 (35%) |
75 day |
||
|
6. Final report summarizing the content of all the work done and of Reports, as described under points 2-5 above. |
10 |
5 |
5 |
5 |
25 (10%) |
80 day |
|
|
TOTAL |
75 |
65 |
65 |
45 |
250 (100%) |
||
QUALIFICATIONS AND EXPERIENCE
|
Qualification criteria |
Score |
|
1. Legal entity/consortium with a minimum of 5 years of experience in providing consultancy services (feasibility studies and/or technical-economic studies and/or design/technical analyses) for infrastructure investments and/or technical systems (including field assessments and technical reports) – at least 3 contracts signed within the last 5 years. |
10 |
|
2. Proven experience in measurement/observation systems and/or sensor-based equipment and data collection (e.g., observation stations, sensors, instrumentation, telemetry, data loggers, communications, data platforms) – at least 1 contract within the last 5 years. |
30 |
|
3. Proven capacity to prepare technical specifications for similar goods/equipment and systems (essential technical parameters, compatibility/interoperability requirements, commissioning/acceptance) – at least 1 contract within the last 5 years. |
30 |
|
4. Experience working with the public sector and/or projects financed by international organizations (e.g., World Bank, EIB, EBRD, United Nations Development Programme, FAO, etc.) – at least 1 contract during the period 2021–2025. |
10 |
|
5. Capacity of the proposed team: relevant key experts for the assignment, as follows: Team Leader / Feasibility Study Specialist (institutional and managerial assessment, technical analysis, economic-financial analysis, social and environmental impact, risk analysis) a) Qualifications: Master's degree, University degree in economics, finance, or related fields. b) Experience: At least 7 years of professional experience in managing similar internationally or nationally financed projects, including coordination of multidisciplinary teams and stakeholder engagement. c) Competencies: Leading multi-stakeholder initiatives, mission coordination, preparation of feasibility studies, including technical and economic-financial analyses, institutional and managerial assessments, social and environmental impact assessments, and risk analysis. Hydrometeorology Expert (network analysis, with recommendations regarding the expansion and placement of new infrastructure in relation to local needs and WMO recommendations): a) Qualifications: University degree in meteorology, hydrology, geography, or Earth sciences. b) Experience: At least 5 years of professional experience in managing similar projects (hydrometeorological monitoring network infrastructure), financed internationally or nationally. c) Competencies: Mission coordination, preparation of specialized analyses and studies, including institutional and management assessments related to social and environmental impact. Ability to communicate effectively and build meaningful partnerships with all stakeholders. Full knowledge of WMO regulations and recommendations regarding network design is essential. Technical Specialist 1 (design of meteorological and hydrotechnical infrastructure, etc.): a) Qualifications: University/postgraduate degree in civil engineering, architecture, or other related technical fields. b) Experience: Strong knowledge of national legislation, standards, and regulations relevant to the construction sector. Strong knowledge and extensive experience in the use of cost estimation and budgeting software similar to WinSmeta. c) Competencies: Ability to deliver expected results in a dynamic working environment. Demonstrated interpersonal skills and the ability to communicate effectively and build meaningful partnerships with all stakeholders. Responsibility, flexibility, punctuality, and the ability to meet deadlines and prioritize multiple tasks. Technical Specialist 2 (design of observation systems, equipment, data/telemetry/IT systems): a) Qualifications: University/postgraduate degree in ICT or other related technical fields. b) Experience: Information technologies, telecommunications, and measurement/monitoring systems involving sensor equipment and data collection (monitoring stations, sensors, instrumentation, telemetry, data loggers, communications, data platforms), with extensive technical expertise in IT solutions. Competencies: Ability to deliver expected results in a dynamic working environment. Proven interpersonal skills and the ability to communicate effectively and establish meaningful partnerships with stakeholders. Initiative and ability to work independently. |
20 |
|
TOTAL |
100 |
Annex 1
MINIMUM REQUIREMENTS
for the Premises and Infrastructure of New Meteorological and Hydrological Stations, and Associated Hydrotechnical Stations and Structures, in Accordance with Local Needs and World Meteorological Organization (WMO) Recommendations
|
Name |
Number of stations |
Estimated location according to previous studies |
Buildings |
Infrastructure |
Systems |
|
I. METEOROLOGICAL STATION – MODULAR CONTAINER-TYPE STRUCTURE ON PILLARS – 90 m² |
|||||
|
Construction of the building and municipal infrastructure at the Regional Meteorological Station Comrat |
1 |
Comrat Municipality, outside the built-up area |
- 7 office rooms - 1 kitchen - 1 sanitary unit (restroom) - 1 equipment storage room - Offices to be furnished and equipped. |
- Access road (from the main road) – 200 linear meters - Utility networks (electricity, water supply, sewage) - Protective fence – 400 linear meters - Station area – 1 ha - Meteorological platform (26 × 26 m) – 104 m² - Gate (3.5 m × 1.55 m) – 1 unit - Small gate (0.9 m × 1.55 m) – 2 units - Paved surfaces with curbs (courtyard, sidewalks) - 250m² - Information board |
- 8–10kW photovoltaic system - Heating system - Air conditioning system - Water supply system / well - Sewage system / septic tank - Video surveillance system - Fire protection system - Security system - Street lighting |
|
II. METEOROLOGICAL STATION – MODULAR CONTAINER-TYPE STRUCTURE ON PILLARS – 54 m² |
|||||
|
Construction of the building and municipal infrastructure at the Bravicea Meteorological Station |
1 |
Bravicea Village, Călărași District |
- 4 office rooms - 1 kitchen - 1 sanitary facility (restroom) - 1 equipment storage room - Offices to be furnished and equipped. |
- Access road (from the main road) – 200 linear meters - Utility networks (electricity, water supply, sewage) - Protective fence – 400 linear meters - Station area – 1 ha - Meteorological platform (26 × 26 m) – 104 m² - Gate (3.5 m × 1.55 m) – 1 unit - Small gate (0.9 m × 1.55 m) – 2 units - Paved surfaces with curbs (courtyard, sidewalks) 150m² - Information board |
- 6–8 kW photovoltaic system - Heating system - Air conditioning system - Water supply system / well - Sewage system / septic tank - Video surveillance system - Fire protection system - Security system - Street lighting |
|
III. HYDROLOGICAL STATION – PREFABRICATED MODULAR STRUCTURE ON PILLARS – 36 m² |
|||||
|
Construction of buildings and hydrotechnical infrastructure at Regional Hydrological Stations |
3 |
Prut River 1. Costești Town, Rîșcani District; 2. Ungheni Town, Ungheni District. Nistru River 3. Criuleni Town Criuleni District |
- 2 office rooms - 1 kitchen - 1 sanitary facility (restroom) - 1 boat storage room – 18 m² (metal / corrugated sheet) - Offices to be furnished and equipped. |
- Access road (from the main road) – 50 linear meters - Utility networks (electricity) - Protective fence – 60 linear meters - Station area – 0.02–0.03 ha - Gate (3.5 m × 1.55 m) – 1 unit - Small gate (0.9 m × 1.55 m) – 1 unit - Paved surfaces with curbs (courtyard, sidewalks) – 50 m² - Information board |
- 5 kW photovoltaic system - Heating system - Air conditioning system - Water supply system / well - Sewage system / septic tank - Video surveillance system - Fire protection system - Security system - Platform street lighting |
|
IV. NEW HYDROLOGICAL POSTS |
|||||
|
Construction of hydrotechnical infrastructure and installation of hydrometric measurement equipment at new hydrological stations |
14 |
1) Reservoir lake Dubăsari 2) Leușeni 3) Congaz 4) Taraclia 5) Ciumai 6) Hâncești 7) Pelinei 8) Buciumeni 9) Cobani 10) Pociumbăuți 11) Zâmbreni 12) Tătărești 13) Climăuții de jos 14) Cucuruzeni |
- |
- Access road (from the main road) – 50 linear meters - Riverbed section works and concrete lining - Concrete steps - Level benchmarks (gauging markers) - Suspended bridge - Landscaping of the adjacent area - Information board |
- Video surveillance system - Street lighting |
|
V. EXISTING HYDROLOGICAL POSTS |
|||||
|
Construction and installation of hydrotechnical infrastructure and hydrometric measurement equipment at existing hydrological stations |
12 |
1) HP Șirăuți r.Prut 2) HP Leova r.Prut 3) HP Brânza r.Prut 4) HP Trinca, r.Draghiște 5) HP Bălți, r.Răut 6) HP Cubolta, r.Cubolta 7) HP Telenești, r.Ciulucul Mijlociu 8) HP Goian, r.Ichel 9) HP Balasinești, r.Vilia 10) HP Brânzeni, r.Racovat 11) HP Merenii Noi, r. Bâc 12) HP Căușeni, r. Botna |
- |
Type and volume of works according to the proposals of the Feasibility Study specialists, up to the following standard: - Access road (from the main road) – 50 linear meters - Riverbed section works and concrete lining - Concrete steps - Level benchmarks (gauging markers) - Suspended bridge - Landscaping of the adjacent area - Information board |
- Video surveillance system - Street lighting |
Annex 2.
FORM
for the Identification and Evaluation of Public Capital Investment Projects
Section A:
Summary of the Submitted Information
|
Project Title: |
|
|
Total Cost (thousand MDL): |
|
|
Implementation Period: |
|
|
Authority: |
|
|
Institution: |
Section B:
Information Regarding Project Feasibility
|
1. |
Project Summary |
|
1.1. |
Project Goal |
|
1.2. |
Strategic Framework |
|
1.3. |
Beneficiaries |
|
1.4. |
Location |
|
1.5. |
Possible Funding Sources |
|
2. |
Technical Analysis |
|
2.1. |
Technical Specifications and Resources |
|
2.2. |
Required Technology |
|
2.3. |
Operational/Functional Assessment |
|
3. |
Economic and Financial Analysis |
|
3.1. |
Case Study (Project Rationale) |
|
3.2. |
Financial Study (Project Costs and Benefits) |
|
3.3. |
Cost–Benefit Analysis / Cost-Effectiveness Analysis |
|
4. |
Legal Assessment |
|
5. |
Institutional and Management Assessment |
|
6. |
Social Impact Assessment |
|
7. |
Environmental Impact Assessment |
|
8. |
Risk Analysis |
Annex 3
Permits and authorizations required for each site validation and confirmation of preliminary requirements
For each identified and analysed location, the provider shall deliver permitting documentation models sufficient for launching the design of future works and obtaining the construction permit.
The permitting documentation (models of documents prepared and drafted by experts) shall include the documents described in the Urban Planning and Construction Code of the Republic of Moldova (Articles 104 and 105), as follows:
The Feasibility Study shall be prepared in accordance with the requirements of the World Bank (Annex 4) and WMO recommendations and shall explicitly take into account potential environmental and climate risks (e.g., locations in protected areas, flood-prone areas, or areas with contested land use) and, where applicable, shall propose appropriate mitigation measures.
Annex 4.
Environmental and social impact assessment requirements to be addressed in the Feasibility Study
The feasibility Study will assess specific environmental and social aspects for each location described in Annex 1.
1. Environmental vulnerabilities and natural hazards
The study should identify site-specific risks that may affect the integrity of the new buildings:
2. Biodiversity and protected areas
Even if the risks are estimated as moderate, it is mandatory to check the following:
3. Biodiversity and Aquatic Ecosystems
4. Waste and toxic substance management
This is a critical component that must be analysed in detail from the feasibility phase:
5. Social and gender vulnerabilities
The Study will contain an analysis of the social (human) context of construction activities:
Community safety: assessment of the impact of construction material transportation and noise, dust and vibration on communities: hospitals, schools or nearby residential areas.
Annex 5
Feasibility Study Table of Contents
The final version of the Feasibility Study shall represent the consolidating document in which all collected and processed information will be presented. The study will include technical analysis, economic-financial analysis, management assessment, as well as social, environmental impact assessment and risk analysis.
For ease of reading, the report shall include interactive graphical presentations and annexes with statistical data, presenting relevant quantitative and qualitative information collected and compiled throughout the implementation period.
This stage is the final one of the 5 activity blocks established under paragraph 17 of the present TOR and involves the compilation of all information gathered in previous stages. The proposed structure[5] of the Feasibility Study is as follows:
[1] The assessment report of the existing hydrological observation network shall be prepared based on the studies on the improvement of the meteorological and hydrological observation network, carried out with the support of international experts under the National Adaptation Planning Project on Climate Change (NAP-2), implemented by the United Nations Development Program (UNDP).
[2] The project envisages the design and construction of new meteorological stations for the relocation of the premises and infrastructure of existing stations to new locations, due to the lack of representativeness of the existing stations.
[3] The design and construction of new hydrological stations shall be carried out according to the respective river basins. Currently, the premises of the existing hydrological stations are located outside the monitored water bodies and do not have separate facilities with the necessary infrastructure.
[4] The IP AMM specialists shall assist the project team in the process of validating site locations and shall ensure the completion of the process in accordance with their institutional competencies and prerogatives.
[5] The structure may be modified depending on the specific requirements of the Beneficiary.